Update on CN freight traffic on the EJ&E

The purchase of the EJ&E railroad tracks by Canadian National in 2008 was contentious in a number of Chicago suburbs. Here is an update on freight figures as the federal requirement that CN report data to local communities has ended:

Freight trains on the old EJ&E tracks have spiked from about four or five daily to 19 or 20 in communities stretching from Lake Zurich to Barrington and West Chicago.

But municipalities such as Buffalo Grove and Des Plaines are getting fewer trains. There were 3.6 freights a day in November compared to 19 before the merger as CN moved trains to the EJ&E tracks, which form a semicircle along the North, West and South suburbs…

Barrington and the Illinois Department of Transportation, with support from U.S. Sens. Tammy Duckworth and Dick Durbin, want to extend the oversight period by two years and get CN to chip in for an underpass at Route 14. The underpass will allow ambulances to reach Advocate Good Shepherd Hospital quickly and prevent traffic backing up, Darch said…

The freight train increase is no surprise and is below projections on average, the railroad has stated.

Looking back, it appears that the train traffic has shifted further away from the Chicago. This was the original plan as so many tracks and trains go through the Chicago region that congestion is a major issue. For the whole region, this changed freight train pattern is probably a good thing. But, if “all politics is local,” this may be truest in suburbs where any perceived negative change – such as an increase in trains – is seen as destroying an idyllic locale where homeowners have invested much money.

Reducing trespassing on railroad tracks

Experts from several areas are working to limit the number of people on railroad tracks:

Trespassing numbers have remained fairly steady over the years and now account for about 72 percent of all railroad-related deaths, with 761 fatalities in 2015, including 296 suicides.

Safety experts are now focused on finding ways to cut trespassing through education, intervention and barriers such as fencing at popular trespassing spots. But advocates concede it won’t be easy — there are 140,000 miles of railroad track in the United States, and it is impossible to contain it all.

“Trespassing has been more of a stubborn problem for us,” said Bonnie Murphy, president and CEO of Operation Lifesaver, a national train safety organization, who spoke along with other safety experts at the biennial DuPage Railroad Safety Council conference last week. “There’s a disturbing, ongoing trend of people walking along the tracks.”

This is an important safety issue. But, it raises a larger question: while the lines are technically private property, how do you realistically keep people off of them when they crisscross all parts of America at ground level? Railroads rejected the idea long ago that fences should be built along the thousands of miles of lines. There is no mention in this article of enforcing trespassing but I assume this would require a significant amount of resources. Cameras at important locations? Warning signs at regular intervals along the lines? Trains using a more effective warning signal of their arrival (think of a targeted rumbling option from a longer distance)? More effort at moving rail traffic away from major population centers (such as going around major metropolitan regions when possible)?

Railroads can be incredible at moving freight and people long distances. However, they don’t interact well with pedestrians.

Illinois Tollway, Canadian Pacific Railroad fighting over railyard land

Both railroads and tollways are important in the Chicago region so which should get their way when they both want the same land?

The Tollway has already built part of I-390 with the intention of extending it east to O’Hare. A new tollway would meet I-390 and connect it north to I-90 and south to the Tri-State Tollway along the airport’s western border. The project is expected to cost about $3.5 billion…

In March 2014, Canadian Pacific asked for $114 million for land acquisition and improvements to its Bensenville yard. The Tollway wants to use about 36 acres of the yard for the highway project. But the Tollway said CP restricted Tollway access to the yard, interfering with its ability to study the area to respond to the offer.

Schillerstrom said that the Tollway presented plans that addressed the railroad’s operational and land acquisition worries in November 2015, but CP ended discussions and since then has not been willing to discuss anything…

“With $140 million in federal dollars already invested in the project, Sen. Durbin is concerned about Canadian Pacific’s newfound unwillingness to work with the Tollway and other stakeholders,” Marter said. “After years of working toward a mutually beneficial solution, the railroad’s about-face is troubling.”

I’m a little surprised the state let this go so long and/or they didn’t wrap this piece of the puzzle up before they put themselves between a rock and a hard place. I imagine the public might rally around the cause of the tollway here – the road could help a number of drivers – but CP is correct about the level of railroad gridlock in the Chicago region. Say more about this particular railyard here; the picture at the top highlights the size of the facility.

Might this call for some sort of deal where the land in this railyard is traded for some other land or access elsewhere in the region? One solution to railroad congestion is to funnel more traffic around the edges of the region.

 

Slow process for possible new rail line around Chicago area

While the mayor of Aurora praised plans for a new railroad line around the Chicago area, the process of approval will take some time:

Not that everyone loves the idea. At a recent public hearing in Belvidere, near Rockford, some 400 people showed to say the train line would be dangerous in their areas, and would impact farms and groundwater. The U.S. Surface Transportation Board held a series of hearings on the proposed railroad, and took public comment through the middle of June. The board will issue an environmental impact statement, followed by more public hearings. A final impact statement is likely two to three years away, and then the Surface Transportation Board must approve the railroad before construction could begin.

Not only does new infrastructure require large sums of money, it often involves a lengthy process involving federal and local agencies as well as local residents and local officials. As has been noted by multiple commentators, this can make infrastructure projects very difficult to construct. By the time all the hoops have been jumped through, the money secured, and bids and plans approved, a significant amount of time has passed. At the same time, not all major infrastructure projects are worthwhile. I’m thinking particularly of highways in major cities, like along the Embarcadero in San Francisco, the elevated highway in Boston which was replaced in the Big Dig, or the Lower Manhattan Expressway that was never built. So, we have a system that slows down the process, which helps in some circumstances and is burdensome in others.

This is a reminder that perhaps the best way to deal with all of this is to have good foresight. Plan ahead and fewer residents might be affected, costs are lower, and society can benefit from the infrastructure for longer. When governments or private firms wait – for lack of funds, lack of need, political pressure – the construction only becomes more difficult.

Parallel railroad and Internet networks

Railroad right of ways contributed to the current infrastructure of the Internet in the United States:

Google didn’t come to Council Bluffs because of historical resonance. They came for the fiber, which runs parallel to Iowa’s many railroads and interstates. Rail infrastructure has shaped the language of the network (as noted in David A. Banks’s work on the history of the term “online”), the constellation of companies that form the network (most famously with Sprint emerging from the Southern Pacific Railroad’s internal-communications network), and, most relevant to this story, the actual routes that fiber-optic networks run.

Telecommunications companies quickly recognized the value of rail right-of-way as real estate for running cable networks long before the Internet—the first substantial use of rail networks for telecommunication networks starts with telegraphs. It’s a hell of a lot more efficient to run a cable along a single straight shot of property than negotiating easements with every single landowner between, say, Denver and Salt Lake City.

For railroads, this was a win-win, as the right-of-way agreements generate passive income, and the networks could be used for internal operations of the railroads themselves. As the first dot-com bubble expanded, more and more telecoms rushed to place their cables along rail routes. This New York Times story from 2000 documents the moment well; it also uses the delightful (and today, woefully underused) term “cyberage” and mentions an exciting new player in the telecom scene, Enron Broadband Services. Some railroad companies followed Sprint’s suit in this period, creating their own telecom services, like CSX Fiber Networks.

The markers of this right-of-way race along railroad routes (and highways, which have a similar right-of-way appeal to telecoms) are not especially impressive, but pretty hard to ignore. They usually take the form of orange-tipped white poles, or orange metal signs, spaced out a few meters apart running parallel to the rails. The orange part usually has a label warning people to call before digging, a phone number to call, and sometimes the name of the company or government agency that happens to own the buried cable. Labeled this way, fiber markers become a testament to telecom history, bearing names of companies that fell in the bursting of the first bubble, long ago absorbed into larger telecom networks. The new owners apparently don’t bother replacing the poles with their names or logos—presumably because it’s not really financially worthwhile to send someone to put Level 3 stickers over thousands of Global Crossing or Williams Communications logos on signage that’s more or less designed to be ignored by 99 percent of the public, like most network infrastructure.

Fascinating story: the land along the railroad lines turned out to be valuable not just for railroad uses but for any other infrastructure that needed clear paths. If I remember correctly, some of the right of ways were the product of public-private partnerships between the government and railroad companies. For example, completing long railroad lines might require years of negotiating with individual landowners which would delay important construction. To flip this around a bit, what would Internet networks look like today if railroads had never been constructed?

I wonder how much money this generates each year for the railroads. There is certainly plenty of freight traffic in the United States but it would be interesting to know what these particular routes are worth.

Fatalities due to vehicle-train collisions down dramatically

As the Chicago Tribune recently remembered a train-school bus collision that killed 7 in 1995, I looked at the statistics on vehicle-train crash fatalities. The numbers have dropped quite a bit in recent decades:

All Highway-Rail Incidents at Public and Private Crossings, 1981-2014
Source: Federal Railroad Administration
Year Collisions Fatalities Injuries
1981 9,461 728 3,293
1982 7,932 607 2,637
1983 7,305 575 2,623
1984 7,456 649 2,910
1985 7,073 582 2,687
1986 6,513 616 2,458
1987 6,426 624 2,429
1988 6,617 689 2,589
1989 6,526 801 2,868
1990 5,715 698 2,407
1991 5,388 608 2,094
1992 4,910 579 1,975
1993 4,892 626 1,837
1994 4,979 615 1,961
1995 4,633 579 1,894
1996 4,257 488 1,610
1997 3,865 461 1,540
1998 3,508 431 1,303
1999 3,489 402 1,396
2000 3,502 425 1,219
2001 3,237 421 1,157
2002 3,077 357 999
2003 2,977 334 1,035
2004 3,077 372 1,092
2005 3,057 359 1,051
2006 2,936 369 1,070
2007 2,776 339 1,062
2008 2,429 290 992
2009 1,934 249 743
2010 2,051 260 887
2011 2,061 250 1,045
2012 1,985 230 975
2013* 2,098 232 972
2014* 2,287 269 849

* Preliminary statistics

Based on the number of articles I’ve read plus personal experience driving at-grade crossings in the Chicago area (which has many cars driving over railroads tracks each day – in 2014, Illinois had the second most train-vehicle collisions in the country), there are several factors behind this decrease:

  1. Improved signage at many at-grade crossings.
  2. More barriers at crossings that make it difficult to go around gates (longer gate arms) or cross into other lanes (barriers in the middle of the road).
  3. Eliminating at-grade crossings with more underpasses and bridges. These can be expensive but they reduce crashes as well as save time for drivers who don’t have to wait for trains to pass.

Yet, these changes can’t control the actions of drivers as the Chicago Tribune article noted:

But experts say safety is a matter of attitude and awareness, not just signals and signs. That’s the message of groups like Operation Lifesaver and the DuPage Railroad Safety Council, an organization founded by Dr. Lanny Wilson after the death of his daughter at a rail crossing in 1994.

A 2013 University of Illinois at Chicago study found that as many as 4 in 10 Chicago-area pedestrians and bicyclists said they were at times willing to ignore flashing lights, ringing bells and gates at railroad crossings…

Barkan pointed to the Feb. 3 incident in Valhalla, N.Y., when a Metro-North Railroad commuter train struck an SUV at a grade crossing, killing six…

That crash could have been avoided, he said, if the driver had observed the “cardinal rule” of grade crossing safety: “Motorists must never enter a grade crossing until they have a clear exit path that equals or exceeds the length of their vehicle available on the other side of the tracks.”

Reaching zero traffic deaths on the roads also involves continuous improvement at such crossings.

Two solutions for Chicago railroad gridlock

The solution to Chicago’s railroad gridlock is not money, according to a new report:

One proposal said that rail dispatchers working for each of the six major freight railroads, as well as separate rail traffic dispatchers at Amtrak and Metra should be located in a unified control center to coordinate trains and improve on-time performance. It’s not the first time the idea has been put forth. Most of the track in the U.S. is owned by freight railroads and they generally oppose sharing control…

The panel also said that several rail-modernization projects that have been awaiting funding for years should be prioritized.

One is the 75th Street improvement project near the Dan Ryan Expressway in Chicago to eliminate rail conflicts at three rail junctions and one rail-roadway crossing. It involves building two flyover structures, almost 30 miles of new track and new bridges at four locations. The project would eliminate the most congested rail chokepoint in the Chicago terminal district, at Belt Junction, where more than 80 Metra and freight trains cross each other’s paths daily, officials said…

The report also called for expediting the Grand Crossing project in Chicago, as well as improving the approximately 40-mile segment of Norfolk Southern’s rail corridor, used by both freight and Amtrak trains, between Chicago and Porter, Ind.

Centralization and clearing up important bottlenecks. Sounds pretty easy, right? Alas, solving these issues takes a lot of time. I’ve been tracking some of these Chicago area railroad gridlock issues for several years (see an earlier example or two) and change is slow. And this isn’t just because of money issues. There are 160 years of history built into the Chicago railroad lines. There are numerous properties around these sites. There are multiple big corporations as well as government levels and bodies involved. Even if these are changes that everyone agrees are good, the wheels of major infrastructure just often do not turn quickly.

I wonder what it might take to get the residents of the Chicago region to see this as a major issue that needs to be addressed. It does affect daily life for many from using commuter train lines, experiencing blocked at-grade crossings, and the noise and pollution generated by nearby trains. Yet, I imagine many area residents don’t know much about the issue and wouldn’t quite be sure how to affect change (assuming a good number wouldn’t want to pay higher taxes to help provide the funding).

 

Still looking for money to solve Chicago freight rail traffic congestion

Illinois politicians can occasionally work together: they are still searching for funds to tackle freight rail congestion.

In an unusual display of local bipartisan unity, 13 of Illinois’ 18 U.S. House members have signed a letter urging that any new federal transportation bill include guaranteed funding to decongest the Chicago area’s crowded freight rail network.

The letter, sent to the chairman and ranking member of the Committee on Transportation and Infrastructure, comes at a critical time, as Congress shows signs of both finally producing a long-term funding bill and remaining stuck in a stalemate that has persisted for most of a decade…

But key rail hubs including Chicago received inadequate funding in prior bills, the letter says. To alleviate that, not only is a dedicated funding stream needed, but spending should focus on metropolitan areas, include access to multimodal facilities and allow for a competitive grant program for “complex mega-projects that have significant national and regional economic and quality of life benefits.”

That appears to be a reference to this area’s Create program, which has been only partially funded.

The funding shortfall continues even as the Chicago region handles a lot of train traffic. This has both local effects (blocked crossings) and national consequences (delayed freight traffic). However, the problem doesn’t get much attention: the freight traffic is distributed across railroad lines and facilities, the public doesn’t know much about it (outside of seeing block crossings as a nuisance) or doesn’t see it (intermodal facilities are big but often hidden), and a variety of levels of government aren’t exactly rolling in a lot of money to be spent on infrastructure (and there are other infrastructure matters requiring attention as well).

At what point would it be reasonable to ask the rail companies to fund some of these needed improvements? While this is important and costly infrastructure, couldn’t money be saved if someone acted sooner rather than later?

The need for infrastructure to move future freight

This look at the future of moving freight in the United States suggests there is work to be done in developing the necessary infrastructure:

The scale of the infrastructure that moves our stuff is staggering, yet we hardly notice it beyond appreciating how fast a book has arrived or growing agitated with double-parked delivery trucks. But the ships, trains, trucks, ports, rails, roads, and support structure that facilitates the metabolism of our society will soon be more visible. The Census Bureau estimates a nearly 20 percent population increase by 2040—that’s one new person every 12 seconds who needs and wants stuff…

As ships bring bigger swells of goods and ask for quicker turnaround times, the ports are focusing on how to get those goods off the ship and on the roads or rails faster. So while ships are maximizing economies, ports are focusing on efficiency. “We are using less to move more,” said Curtis Foltz, executive director of the Georgia Ports Authority, echoing the company tagline (“we use less to move more”). The authority recently converted as much equipment as possible from diesel to electric, including cranes that generate 30 percent of their own power from gravity, and efficient rack systems for growing numbers of “reefers,” or refrigerated containers…

The DOT estimates an 88 percent increase in rail freight demand by 2035, and Forbes recently predicted that rail will become the most important logistics system of the 21st Century. The reliability and efficiency of rail is already eating into trucking’s market share, as trains are increasingly used for hauls as short as 500 miles, formerly only the domain of trucks. But increasing capacity of the country’s 140,000-mile rail network and its upkeep will require huge capital expenditure, estimated by the Federal Railroad Administration to reach $149 billion over the next 20 years…

The Federal Highway Administration has some numbers to consider: In 2011, approximately 11 million trucks moved 16.1 billion tons of freight worth $14.9 trillion. This level of activity caused recurring peak-period congestion on 10 percent of the National Highway System. Now consider that commercial vehicles currently account for only 9 percent of all vehicle highway miles traveled. Think rush hour is bad now? The FHA estimates that in the next 30 years, there will be 60 percent more trucks, translating to significant slowing on 28,000 miles of the NHS during peak hours, and stop-and-go conditions on an additional 46,000 miles.

There may be a lot of interest in driverless cars but it just be “old” technologies like ships and railroads that keep the flow of goods moving as well as large trucks. When you think about, the whole system is quite amazing: transporting enough goods for 300+ million people requires a lot of coordination and energy.

It will be interesting to see who pays for these upgraded structures; improving ports, for example, could be economic boosts but they are not usually sexy projects and there are plenty of more immediate quality-of-life issues that get more attention (education, health care, etc.) Would consumers complain if the cost of their relatively cheap goods went up to pay for some of these improvements?

Chicago area transit problem: “Only 12 percent of suburbanites can get to work in less than 90 minutes via mass transit”

As Chicago area leaders debate how local groups should approach regional mass transit, a Chicago Tribune editorial in favor of shaking things up says changes would make mass transit more accessible:

The group’s 95-page report suggests measures to curb the sort of political meddling that led to the resignations of six Metra board members. It also makes a case that a streamlined organizational chart would reduce corruption simply by limiting the number of actors…

Our region’s three transit agencies waste tax dollars on lobbyists to compete with one another for more tax dollars for parochial priorities, instead of developing a consensus vision that would lead to more investment. From 2002 to 2012, consolidated transit systems serving Boston, New York, Philadelphia, San Francisco and Washington, D.C., have spent almost twice as much per resident on transit as Chicago has, the task force says.

Lack of coordination between the CTA, Metra and Pace means that riders whose commutes involve switching from bus to train or vice versa are stuck with long waits, poor connections and multiple fare systems. The task force says only 12 percent of suburbanites can get to work in less than 90 minutes via mass transit.

That last figure is important: mass transit is really a limited option in the Chicago suburbs. While there are still transit issues in Chicago itself (expanding L lines, building more bicycles paths and lanes), the issues in the broader region often get overlooked. Suburban job centers are not connected. The railroad lines run into the city, meaning commuters can’t make connections to other lines often until they are in Chicago’s Loop. If the region was still centered on lots of jobs in the Loop, this all might make sense. But, it hasn’t been this way for decades and the suburban mass transit options have not kept pace.